logo
Careers
Connect:
  • Services
  • Portfolio
  • About
    • The Firm
    • Leadership
    • Careers
  • News
  • Contact

Roosevelt Middle School Whole Site Modernization Phase 1

July 21, 2026

Turpin & Rattan Engineering, Inc. is proud to celebrate a major milestone in Phase 1 of the Roosevelt Middle School Whole Site Modernization.
Founded in 1922 and located adjacent to the San Diego Zoo, Roosevelt is one of San Diego’s first junior high schools. Phase 1 is creating a more accessible, sustainable, secure, and modern campus through a new administration building, new classrooms, restroom upgrades, and major site and utility improvements.

As the Electrical and Fire Alarm Engineer and Technology Consultant, Turpin & Rattan Engineering, Inc. supported the project through upgraded power distribution, Title 24-compliant lighting and controls, enhanced life safety and security systems, modern telecommunications infrastructure, and electrical provisions for photovoltaic systems and electric vehicle charging.

The project team was also recognized by San Diego Unified School District for achieving an exceptionally low rate of architect and engineer errors and omissions to date.

Thank you to San Diego Unified School District, Sprotte+Watson Architecture, and the entire project team for the opportunity to contribute to this important campus transformation.

Filed Under: Uncategorized

LOS ANGELES

P: 818.249.0444 engineer@treila.com

San Diego

P: 619.466.6224 engineer@treisd.com

Las Vegas

P: 702.834.3880 engineer@treilv.com

Denver

P: 818.249.0444 engineer@treidv.com

Privacy Policy | © 2026, Turpin & Rattan Engineering, Inc. All rights reserved. Design by TinyFrog Technologies