Clark County 309 South Third Chiller Replacement

This project consisted of the Replacement of (2) nominal 200 ton water-cooled chillers, (15) existing
chilled water and condenser water pneumatic control valves/actuators with DDC (direct digital control)
ones and replacement of (2) existing 2-pipe fan coil units serving the existing chiller room. The project
also included Addition of 6” emergency chilled water piping and connection to existing chilled water piping
loop, addition of (5) new chilled water and condenser water DDC control valves and addition of temporary
cooling skid and temporary power.

LOS ANGELES

P: 818.249.0444 engineer@treila.com

San Diego

P: 619.466.6224 engineer@treisd.com

Las Vegas

P: 702.834.3880 engineer@treilv.com

Denver

P: 818.249.0444 engineer@treidv.com

Privacy Policy | © 2025, Turpin & Rattan Engineering, Inc. All rights reserved. Design by TinyFrog Technologies